M. Osanloo
۱۳ مقاله۳ نشریهسالهای فعالیت: ۱۹۹۷–۲۰۲۱
- Mining and Metallurgical Engineering Department, Amirkabir University of Technology (Tehran Polytechnic), Tehran, Iran (۱۹۹۷–۲۰۲۰)
19972021
مقالهها (۱۳)
Determination of an Optimum Interface between Open-Pit and Underground Mining Activities in Mazinu Coal Mine of Tabas Power Plant
A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
An Uncertainty-based Transition from Open Pit to Underground Mining
A New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure
UPL determination of multi-element deposits with grade uncertainty using a new block economic value calculation approach
Multiple Destination Influence on Production Scheduling in Multi-element Mines
Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
An Approach to Locate an in Pit Crusher in Open Pit Mines
A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach
Cutoff grades optimization with environmental management A case study: Sungun Copper Project
Using 2D Lerchs and Grossmann Algorithm to Design Final Pit Limits of Sungun Copper Deposit of Iran (TECHNICAL NOTE)
Determination of Blasthole Parameters Based on Field Results (TECHNICAL NOTE).